New Balconies – Renovation and Expansion

New Balconies – Renovation and Expansion New Balconies – Renovation and Expansion Role: Consulting, execution, construction management, and supervision Client: Condominium Association Ejboparken Scope: 360 condominiums Construction Period: 2020-2021 The project involved extending and enclosing the existing worn-out balconies, which required a renovation of the reinforcement in the balcony decks. New enclosed balconies have been […]
Husum Torv – Housing and Grocery Store

Husum Torv – Housing and Grocery Store Overview model of the entire project Husum Torv – Housing and Grocery Store Role: Project Management, Engineering Consultant for all disciplines, and joint architectural consultant with Norrøn Architects Area: Approximately 3,200 m² Client: Momentum Plus Status: Authority project delivered in 2023 The project consists of two parts: one […]
Hot Water Systems

Hot Water Systems Hot Water Systems Role: Consultant Scope: Two residential blocks with a total of 72 apartments Client: Condominium Association Rosagården 6-7 Construction Period: 2020 To extend the lifespan and save energy, the entire hot water system was replaced in the apartments. Additionally, new pre-insulated pipelines were installed underground between the buildings. New Balconies […]
Center for Flood Protection

Center for Flood Protection Center for Flood Protection Role: Consultant Client: Roskilde Fire Department and Roskilde Municipality Architect: Environment Solutions Construction Period: 2021-2022 The world’s first training and testing center for flood protection against cloudbursts and storm surges. “With the center, it will be possible for emergency services, private solution providers, knowledge institutions, and citizens […]
Heat Centers

Heat Centers Heat Centers Role: Consultant Scope: Renovation of 12 heat centers with a total of 242 apartments Client: Boligkontoret Danmark, Boligselskabet Birkebo Construction Period: 2021-2022 Energy optimization through the renovation of 12 heat centers and adaptation to district heating supply. Hot Water Systems Expansion of Green District Heating
Roskilde Business School – Renovation

Roskilde Business School – Renovation Roskilde Business School – Renovation Role: Engineering and Architectural Consultant Area: 3,000 m² Client: Roskilde Business School Status: Under construction The project includes new wooden facade cladding with additional insulation, new windows and exterior doors, as well as new roof cladding. Internally, the space has been redesigned for teaching the […]
New Balcony – Expansion

New Balcony – Expansion New Balcony – Expansion Role: Engineering and Architectural Consultant Client: Private client Status: Sketch proposal delivered in winter 2024 The project involves expanding the existing balcony on the first floor to harmonize with the new balconies on the second floor. At the same time, it has aimed to create a more […]
Heat Exchanger Station Køge

Heat Exchanger Station Køge Heat Exchanger Station Køge Role: Project Management, project leadership, and engineering and architectural consultancy for all disciplines Area: Approximately 550 m² Client: VEKS Status: Sketch proposal delivered in spring 2023 At Norsyn, we were tasked with designing a new heat exchanger station to be located next to the industrial area on […]
Pit Heat Storage

Pit Heat Storage Pit Heat Storage Role: Consultant Area: 400 m² Client: Høje Taastrup District Heating and VEKS Contractors: DS Flexhal, Brøndum, and Kallesøe Construction Period: 2020-2021 The project involves the establishment of a pit heat storage facility with a capacity of 70,000 cubic meters, along with associated technical facilities in the form of a […]
Expansion of Green District Heating

Expansion of Green District Heating Expansion of Green District Heating Role: Consultant Pipeline Length: 90 km main pipeline and 180 km service lines Contractors: NCC/Brøndum and Munck Supply Lines/Østergaard Enterprise Client: Gentofte Municipality/GG District Heating Construction Period: 2021-2027 The project includes phasing out natural gas, resulting in CO2 savings of 24,000 tons per year, which […]