Husum Torv – Housing and Grocery Store

Husum Torv – Housing and Grocery Store Overview model of the entire project Husum Torv – Housing and Grocery Store Role: Project Management, Engineering Consultant for all disciplines, and joint architectural consultant with Norrøn Architects Area: Approximately 3,200 m² Client: Momentum Plus Status: Authority project delivered in 2023 The project consists of two parts: one […]

Hot Water Systems

Hot Water Systems Hot Water Systems Client: Condominium Association Rosagården 6-7 Role: Consultant Scope: Two residential blocks with a total of 72 apartments Construction Period: 2020 To extend the lifespan and save energy, the entire hot water system was replaced in the apartments. Additionally, new pre-insulated pipelines were installed underground between the buildings. New Balconies […]

Center for Flood Protection

Center for Flood Protection Center for Flood Protection Client:Roskilde Fire Department and Roskilde Municipality Role: Consultant Architect: Environment Solutions Construction Period: 2021-2022 The world’s first training and testing center for flood protection against cloudbursts and storm surges. “With the center, it will be possible for emergency services, private solution providers, knowledge institutions, and citizens to […]

New Balconies – Renovation and Expansion

New Balconies – Renovation and Expansion New Balconies – Renovation and Expansion Client: Condominium Association Ejboparken Role: Consulting, execution, construction management, and supervision Scope: 360 condominiums Construction Period: 2020-2021 The project involved extending and enclosing the existing worn-out balconies, which required a renovation of the reinforcement in the balcony decks. New enclosed balconies have been […]

Heat Centers

Heat Centers Heat Centers Client: Boligkontoret Danmark, Boligselskabet Birkebo Role: Consultant Scope: Renovation of 12 heat centers with a total of 242 apartments Construction Period: 2021-2022 Energy optimization through the renovation of 12 heat centers and adaptation to district heating supply. Hot Water Systems Expansion of Green District Heating

Roskilde Business School – Renovation

Roskilde Business School – Renovation Roskilde Business School – Renovation Client: Roskilde Business School Role: Engineering and Architectural Consultant Area: 3,000 m² Status: Under construction The project includes new wooden facade cladding with additional insulation, new windows and exterior doors, as well as new roof cladding. Internally, the space has been redesigned for teaching the […]

New Balcony – Expansion

New Balcony – Expansion New Balcony – Expansion Client: Private client Role: Engineering and Architectural Consultant Status: Sketch proposal delivered in winter 2024 The project involves expanding the existing balcony on the first floor to harmonize with the new balconies on the second floor. At the same time, it has aimed to create a more […]

Heat Exchanger Station Køge

Heat Exchanger Station Køge Heat Exchanger Station Køge Client: VEKS Role: Project Management, project leadership, and engineering and architectural consultancy for all disciplines. Area: Approximately 550 m² Status: Sketch proposal delivered in spring 2023 At Norsyn, we were tasked with designing a new heat exchanger station to be located next to the industrial area on […]

Pit Heat Storage

Pit Heat Storage Pit Heat Storage Client: Høje Taastrup District Heating and VEKS Role: Consultant Contractors: DS Flexhal, Brøndum, and Kallesøe Area: 400 m² Construction Period: 2020-2021 The project involves the establishment of a pit heat storage facility with a capacity of 70,000 cubic meters, along with associated technical facilities in the form of a […]

Expansion of Green District Heating

Expansion of Green District Heating Expansion of Green District Heating Client: Gentofte Municipality/GG District Heating Role: Consultant Contractors: NCC/Brøndum and Munck Supply Lines/Østergaard Enterprise Pipeline Length: 90 km main pipeline and 180 km service lines Construction Period: 2021-2027 The project includes phasing out natural gas, resulting in CO2 savings of 24,000 tons per year, which […]