District Heating Rollout – Vestforbrænding Programmes 1 and 2

District Heating Rollout – Vestforbrænding Programmes 1 and 2 District Heating Rollout – Vestforbrænding Programmes 1 and 2 Role: Consultant to turnkey contractor M.J. Eriksson Scope: 170 km of main distribution pipework and more than 10,000 new customers Client: Vestforbrænding Partners: M.J. Eriksson, Østergaard Entreprise, VVS Syd, Isoplus and LOGSTOR Period: 2023-2025 In spring 2022, […]

District Heating Rollout – Helsingør Climate-Adapted City Core

District Heating Rollout – Helsingør Climate-Adapted City Core District Heating Rollout – Helsingør Climate-Adapted City Core Role: Consultant – District Heating Scope: 50.000 m2 with 4,000 meters of piping, and 350 end-users Client: Helsingør Municipality and Forsyning Helsingør Project partners: WSP and Schønherr Period: 2025-2035 The project protects the city’s housing, businesses, and valuable cultural […]

District Heating Rollout – Køge Town Centre

District Heating Rollout – Køge Town Centre District Heating Rollout – Køge Town Centre Rolle: Consultant – design and site supervision Scope: Pipe network ranging from CU28 to DN300, heat exchanger station and building Client: Køge District Heating Contractor: Bravida Period: 2022-2024 Køge District Heating has been expanding its district heating network over several years. […]

District Heating Rollout – Herstedøster

District Heating Rollout – Herstedøster District Heating Rollout – Herstedøster Role: Consultant – design Scope: 3,500 m of pipeline supplying 70 customers Client: Albertslund Utility Contractor: Hoffmann Period: 2022-2023 The project comprised the establishment of a complete district heating system as part of the transition to low-temperature district heating in the village of Herstedøster in […]

District Heating Rollout – Egedal

District Heating Rollout – Egedal District Heating Rollout – Egedal Role: Consultant Scope: 95 km of main and distribution pipes in sizes from DN32 to DN250 and over 5,000 customer connections with an additional 100 km of service lines Client: Egedal District Heating Contractors: Nordkysten, NCC, Schiøler Rør, JHH Entreprenør, and Poul Sejr Period: 2022-2029 […]

District Heating Rollout – Greve Phase 1

District Heating Rollout – Greve Phase 1 District Heating Rollout – Greve Phase 1 Role: Consultant Scope: Client: Greve District Heating Period: 2022-2026 Large parts of Greve are currently supplied with natural gas. Greve District Heating, in collaboration with Norsyn, has investigated the possibilities for expanding district heating to the entire Greve Municipality. Initially, Norsyn […]

District Heating Roll-out – Gentofte

District Heating Roll-out – Gentofte District Heating Roll-out – Gentofte Role: Consultant Pipeline Length: 90 km of main transmission pipes and 180 km of service connections Client: Gentofte Municipality/GG District Heating Contractors: NCC and Munck Forsyningsledninger/Østergaard Entreprise Period: 2021-2029 The project includes the phase-out of natural gas corresponding to annual CO₂ savings of 24,000 tons […]

Renovation of District Heating Pipelines – Norfors

Renovation of District Heating Pipelines – Norfors Renovation of District Heating Pipelines – Norfors Role: Consultant Client: Norfors Period: 2016 The assignment involved engineering consultancy related to detailed design and execution of district heating renovation in the areas of Stampetoften, Stampeengen, and the residential neighbourhoods around Elsdyrvej and Hjortevej in Hørsholm. Existing pre-insulated district heating […]

Pipe Bridge – 3D Design

Pipe Bridge – 3D Design Pipe Bridge – 3D Design Role: Consultant Client: HOFOR Period: 2015-2016 As part of the district heating expansion at Kalvebod Brygge, additional capacity was needed for the pipeline crossing Vasbygade. Vasbygade is a four-lane arterial road and one of the main access routes into Copenhagen, making it essential that the […]

New Biomass Heating Plant – Hillerød District Heating

New Biomass Heating Plant – Hillerød District Heating New Biomass Heating Plant – Hillerød District Heating Role: Consultant Scope: 20 MW wood chip-based district heating plant and 15 km transmission pipeline Client: Hillerød Varme A/S Project partner: NIRAS Period: 2014-2015 Following the acquisition of district heating networks in smaller towns within Hillerød Municipality, Hillerød Varme […]