Vestforbrænding Programmes 1 and 2 – District Heating Rollout

Vestforbrænding Programmes 1 and 2 – District Heating Rollout Vestforbrænding Programmes 1 and 2 – District Heating Rollout Role: Consultant to turnkey contractor M.J. Eriksson Scope: 170 km of main distribution pipework and more than 10,000 new customers Client: Vestforbrænding Partners: M.J. Eriksson, Østergaard Entreprise, VVS Syd, Isoplus and LOGSTOR Period: 2023-2025 In spring 2022, […]
Helsingør Climate-Adapted City Core – District Heating Rollout

Helsingør Climate-Adapted City Core – District Heating Rollout Helsingør Climate-Adapted City Core – District Heating Rollout Role: Consultant – District Heating Scope: 50.000 m2 with 4,000 meters of piping, and 350 end-users Client: Helsingør Municipality and Forsyning Helsingør Project partners: WSP and Schønherr Period: 2025-2035 The project protects the city’s housing, businesses, and valuable cultural […]
Køge Town Centre – District Heating Rollout

Køge Town Centre – District Heating Rollout Køge Town Centre – District Heating Rollout Rolle: Consultant – design and site supervision Scope: Pipe network ranging from CU28 to DN300, heat exchanger station and building Client: Køge District Heating Contractor: Aarsleff Period: 2022-2024 Køge District Heating has been expanding its district heating network over several years. […]
Egedal – District Heating Rollout

Egedal – District Heating Rollout Egedal – District Heating Rollout Role: Consultant Scope: 95 km of main and distribution pipes in sizes from DN32 to DN250 and over 5,000 customer connections with an additional 100 km of service lines Client: Egedal District Heating Contractors: Nordkysten, NCC, Schiøler Rør, JHH Entreprenør, and Poul Sejr Period: 2022-2029 […]
Gentofte – District Heating Roll-out

Gentofte – District Heating Roll-out Gentofte – District Heating Roll-out Role: Consultant Pipeline Length: 90 km of main transmission pipes and 180 km of service connections Client: Gentofte Municipality/GG District Heating Contractors: NCC and Munck Forsyningsledninger/Østergaard Entreprise Period: 2021-2029 The project includes the phase-out of natural gas corresponding to annual CO₂ savings of 24,000 tons […]
Norfors – Renovation of District Heating Pipelines

Norfors – Renovation of District Heating Pipelines Norfors – Renovation of District Heating Pipelines Role: Consultant Client: Norfors Period: 2016 The assignment involved engineering consultancy related to detailed design and execution of district heating renovation in the areas of Stampetoften, Stampeengen, and the residential neighbourhoods around Elsdyrvej and Hjortevej in Hørsholm. Existing pre-insulated district heating […]
Pipe Bridge – 3D Design

Pipe Bridge – 3D Design Pipe Bridge – 3D Design Role: Consultant Client: HOFOR Period: 2015-2016 As part of the district heating expansion at Kalvebod Brygge, additional capacity was needed for the pipeline crossing Vasbygade. Vasbygade is a four-lane arterial road and one of the main access routes into Copenhagen, making it essential that the […]
Hillerød Varme – New Biomass Heating Plant

Hillerød Varme – New Biomass Heating Plant Hillerød Varme – New Biomass Heating Plant Role: Consultant Scope: 20 MW wood chip-based district heating plant and 15 km transmission pipeline Client: Hillerød Varme A/S Project partner: NIRAS Period: 2014-2015 Following the acquisition of district heating networks in smaller towns within Hillerød Municipality, Hillerød Varme A/S identified […]
Guldborgsund – Pipeline Crossing under Railway

Guldborgsund – Pipeline Crossing under Railway Guldborgsund – Pipeline Crossing under Railway Role: Consultant Scope: Two DN323 district heating pipes and two DN40 empty conduits Client: Brøndum Period: 2014-2015 Guldborgsund Varme A/S prepared a preliminary design for the construction of a new district heating connection underneath the railway corridor. The new pipeline replaces an existing […]
VEKS – Transmission Pipeline and Pumping Station

VEKS – Transmission Pipeline and Pumping Station VEKS – Transmission Pipeline and Pumping Station Role: Consultant Scope: 20 km transmission pipeline and pumping station Client: VEKS Period: 2013-2014 To support Køge Municipality’s ambition of establishing district heating, VEKS acquired the biomass-fired combined heat and power (CHP) plant in Køge. The new plant was to be […]